This project required a complete redesign of an in-process product which was not making performance and scheduling targets. Architecturally, the majority of connectors and cables were removed and replaced with board-to-board connectors, resulting in a much cleaner, more cost effective and streamlined design. EMC compliance was built in from the ground up and a new and innovative power amplifier stage was designed.